Baseline Survey for the Material Flow Analysis for Waste Plastics and Hotspots Assessment for Marine Plastic Debris in Bangladesh

Client:  The World Bank Group

Description of work:

Under this assignment Waste Concern Consultants will carry out but not limited to the tasks described below:

Task 1: Hotspots assessment for marine plastic debris
Task 2: Waste composition and material flow analysis for waste plastics
Task 3: Stakeholder analysis for Dhaka Metropolitan Area
Task 4: Develop a framework of multi-sectoral sustainable plastic management plan
Task 5: Informing and Influencing Decision-Making.

Location: Bangladesh

Period: November 2019 to June 2020

Mapping and Screening Study of Marine Littering Projects in Bangladesh

Client:  The Royal Norwegian Embassy, Dhaka
 
Description of work:

The purpose of this consultancy work is to map and screen ongoing and/or potential new projects in Bangladesh connected to preventing or significantly reducing the extent of marine litter from major sources. Closely coordinated with the Government of Bangladesh’s policies and plans, the Waste Concern Consultants is expected to identify existing /ongoing cooperation projects as well as new but already planned projects.  

This assignment will support the Government of Norway in identifying and supporting the most appropriate and efficient projects that aim to prevent marine littering by: (i) Map and rank according to a long-list of potential suitable projects; (ii) Identify a short-list to include three projects to be agreed with the Embassy; (iii) Provide analysis of the short-listed projects.

Location: Bangladesh

Period: November 2019 to June 2020

Design of Integrated Waste Management Facilities in Cambodia and Lao PDR

Client:  Rambøll Denmark A/S
 
Description of work:

As sub-consultant of Rambøll Denmark A/S, Waste Concern Consultants (WCC) will provide following services:

Design the master plan for all six landfill sites
Prepare detailed design, BOQ and specifications for landfill site.  
Prepare design, BOQ for Material Recovery Facility (MRF) with specifications.
Prepare the specifications for all equipments for the landfill sites and MRF

Locations:  Cambodia and Lao PDR

Period:     October 2019 to June 2020

Consulting Services on Non-network Sanitation in Pagla Catchment under the Dhaka Sanitation Improvement Project (DSIP)

 Client:  The World Bank Group

 Description of work:

Under this assignment WCC will be involved in  planning and engineering design of interventions across

(a) Faecal Sludge Treatment Plant (FSTP)
(b) Decentralized Waste Water Treatment System (DEWATS) and
(c) Communal Septic Tank in the Pagla Catchment area of DSIP.

The scope of work is detailed further as follows:

  1. Conceptual design of a faecal sludge treatment plant (FSTP) in Pagla catchment;
  2. Design of a DEWATS system;
  3. Design of Communal Septic Tank; and
  4. Preparation of BOQ and design reports for FSTP, DEWATS and communal septic tanks

Location: Bangladesh

Period: September 2019 to February 2020

Preparation for Environmentally Sound Management of Mercury Containing Lighting Sources with a Life-Cycle Approach

Client: United Nations Industrial Development Organization (UNIDO)

Description of work:

Under this assignment WCC will update the guidelines on the management of used compact fluorescent lamps (CFLs), prepare the national management plan to implement the guidelines and update the legal framework for environmentally sound management of mercury waste for Bangladesh.

Location: Bangladesh

Period: May 2018 to November 2018

Consultancy Services for Landscape and Renovation Work for Savar Residential Campus of BRAC University (sanitation, wastewater, rain water harvesting and solid waste component)

Client: Bengal Abashan Design & Research Limited / BRAC

Description of work:

Under this assignment Waste Concern Consultants is responsible for baseline survey of solid waste, liquid waste (black and gray water) and rain water generated within the BRAC University campus at Savar. Based on the survey responsible for preparation of design and estimate for decentralized waste water treatment system ( for black and grey water), solid waste recycling system and rainwater harvesting system for the campus.  Provide top supervision during construction work. Prepare O& M manual for the decentralized waste water treatment

Location: Bangladesh

Period: November 2017 to June 2018

3R (Reduce, Reuse and Recycle) Pilot Initiative to Reduce the Impact of Greenhouse Gas (GHG) in Dhaka and Chittagong Cities (Phase 1)

Client: Department of Environment (DOE), GoB

Description of work:

Under this project Waste Concern Consultants (WCC) will provide the following technical supports:

-Prepare detailed technical architectural and structural design drawing for the construction of 2 (two) compost plants, 1 (one) in Dhaka North City Corporation (DNCC) and 1 (one) in Dhaka South City Corporation (DSCC).

-Prepare detailed technical architectural and structural design drawing for the construction of 4 (four) Transfer Stations for municipal solid waste, 2 (two) in DNCC area and 2 (two) in DSCC area.

-Assist DoE to carryout capacity building training and income generating activities. Develop awareness generating materials for DoE to carryout awareness generation programs on waste recycling, composting and segregation of waste for citizens, local NGOs, CBOs and private sectors.

-Support DOE to link the project under the existing 64 District CDM project of the Government.

Location: Dhaka, Bangladesh

Period: September 2016 to June 2019

Programmatic CDM Project Using Municipal Organic Waste of Towns (City Corporations/Municipalities) in Bangladesh

Client: Department of Environment, Ministry of Environment and Forests, Government of Bangladesh

Description of work:

Under this project Waste Concern Consultants is providing technical advice to the DoE to prepare the Program of Activities (PoA) and CPA for programmatic CDM project for 64 districts of Bangladesh. Responsible for preparation of design as well as cost estimate of compost plants, waste collection system, biogas plants, and transfer stations. Preparation of Public-Private Partnership (PPP) documents. Preparation of Initial Environmental Examination (IEE)/Environmental Impact Assessment (EIA) reports for compost plants/landfills under the project. Capacity building of municipal officials and private sector plant operator during implementation of the project.

Location:  Bangladesh

Period: June 2011 to June 2020

Consultancy Services for Sanitation and Solid Waste Management under the DDS Consultant, Coastal Towns Environmental Infrastructure Project (CTEIP)

Client: ADB/LGED

Description of work:

Under this project Waste Concern Consultants and Borda Ltd. are responsible as sub-consultant of Eptisa Engineering for i) finalization of sub-projects for implementation (integrated sanitation and solid waste management), ii) preparation of detailed Engineering Design Reports, inclusive of preparation of the specifications, cost estimate, drawings and bill of quantities (for the identified sub-projects (community/public sanitation, Fecal Sludge Management and SWM) and iii) supporting the DDS Consultants on preparation of bidding documents, DDR and IEE/EIA reports for the selected interventions for implementation.

Location: Bangladesh

Period: June 2017 to June 2018

Consultancy Services for Disposal of Empty Pesticide Containers

Client: USAID Agro-Inputs Project (AIP)/CNFA

Description of work:
Under this assignment Waste Concern Consultants is responsible for laboratory testing and data collection regarding use and disposal of empty pesticide containers. Data derived from this research shall be used to identify viability used pesticide container management pilot project.

Location: Bangladesh

Period: August 2016 to October 2016

Pro-poor and Sustainable Solid Waste Management in Secondary Cities and Small Towns

Client: UNESCAP, Thailand

Description of work:
a) Providing advice/guidance in participating towns in refining and operationallizing Integrated Resource Recovery Center (IRRC) approach.
b) Providing advice/guidance in participating cities on developing town wide strategy on municipal solid waste management based on up-scaling of IRRC, recover capital costs through carbon credits/NAMA
c) Piloting of co-composting technology in one city for management of human excreta
d) Piloting of biogas to electricity and bio diesel technology
e) Organizing of training programs on solid waste management, sanitation, business plan preparation, CDM for local government and NGOs/private sector of Asia and the Pacific Region.

Location: Vietnam, Sri Lanka, Nepal, Bhutan, Cambodia & Indonesia

Period: November 2009 to April 2016

Preparation of Sanitation and Drainage Improvement Strategy and Master Plan Project for the City of Chittagong

Client: CWASA/The World Bank

Description of work:

Under this project Waste Concern Consultants is providing Senior Solid Waste and Sanitation Expert for the national and international consultants team (Grontmij, Aqua and IWM), for preparation of strategy, action plan and master plan for solid waste and faecal sludge management sub-component of the project. Providing input for design of a pilot faecal sludge treatment plant as well as collection option of faecal sludge. Moreover, also responsible for preparation of business plan for faecal sludge management. Also responsible for identification of solid waste management projects for collection, storage, transportation, recycling and disposal of solid waste as well as sanitation projects and prepare capital cost and operational cost of different projects for financing by the World Bank

Location: Bangladesh

Period: January 2015 to June 2017