Client The World Bank Group
Description of work:
Under this assignment, WCC was involved in the planning and engineering design of interventions across:
- Faecal Sludge Treatment Plant (FSTP)
- Decentralized wastewater Treatment System (DEWATS) and
- Communal Septic Tank in the Pagla Catchment area of DSIP.
The scope of work is detailed further as follows:
- Conceptual design of a faecal sludge treatment plant (FSTP) in Pagla catchment;
- Design of a DEWATS system
- Design of Communal Septic Tank; and
- Preparation of BOQ and design reports for FSTP, DEWATS and communal septic tanks.
Location: Bangladesh
Period: September 2019 to June 2020