Design of Integrated Waste Management Facilities in Cambodia and Lao PDR

Client    Rambøll Denmark A/S

 

Description of work: 

 

As sub-consultant of Rambøll Denmark A/S, Waste Concern Consultants (WCC) provided the following services:

-Design the master plan landfill sites.
-Prepare detailed design, BOQ and specifications for landfill site.
-Prepare design and BOQ for Material Recovery Facility (MRF) with specifications.
-Prepare the specifications for all equipment for the landfill sites and MRF.
-Prepare design of legacy-based waste management in ladfill site in Lao, PDR

 

Location: Cambodia and Lao PDR

 

Period:    October 2019 to July 2020