Client: Institute for Global Environmental Strategies (IGES)
Description of work: Construction of one community-based composting plant (1.5 ton capacity) in Kushtia Municipality in Bangladesh integrated with house-to-house waste collection. Green house gas emission reduction from the project will also evaluated along promotion of source separation of waste in the municipality. Waste Concern shall carry out a baseline study, prepare IEE report as well as technical design and drawings along with cost estimate and tender documents. Moreover, a publication on the project will also be prepared by Waste Concern.
Location: Kushtia Municipality
Period: October 2007 to June 2008